Order from us for quality, customized work in due time of your choice.
To the person that help me do this assignment. Thank you so much for your help, I have a busy week with jobs hunting, and this class does not even relate to my major. But I have to take it due to the department and university requirement. Please help me do this, I am very grateful. I will upload all the materials, the Case Study, and the instructions slides layout. Please help me. Thank you so much. For the Project instruciton, there are two parts, part one will be include in the file, and I will post the slide order for part 1 here: Project Completion Timeline Due 10/24/2024 Slide 1: Project Heading, Team Members and leaders Slide 2: Synopsis of your project Slide 3: Containment for nonconformance products Slide 4: How did your team perform Gemba and provide at least 5 findings from each the 6 (six) Fish-Bone Diagram factors Slide 5: Using the four KPI provided to you below complete the decision matrix Speed, Dispensing Flow, Effectiveness (Safety), Reduced Need for Suturing Slide 6: Root Cause Analysis Slide 7: Corrective Actions (Minimum 4) Slide 8: Preventive Actions (Minimum 4) Slide 9: Verification of Effectiveness Slide 10: Process Capability and Process Capability Index for all 4 contract manufacturing sites and which one was appropriate for its standard deviation, Cp and CpK? Slide number 10 is for Poject part 2: I will post the information for part 2 in the file, and I will post the questions guide here for part 2 so you can answer and put them in to the slide later. What is the Critical-to-Quality (CTQ) in this study? Find Mean and Std provided for all 4 locations. What are your observations for standard deviations for all CMO locations. Calculate Process Capabilities (Cp and Cpk) for all 4 manufacturing sites? Analyze your findings. What level of Six Sigma do each location standard based on the process capability value. What percent nonconforming (approximate) is each location producing at their Cp level. What are parts per Million (PPM) defects produced based on Cp level for each site? Once again, thank you for your hard work. Please read all the materials including chapters so you can have more information on how to do certain parts required by my professor. Thank you and thank you again
Order from us for quality, customized work in due time of your choice.