POTENTIAL WRITERS, DO NOT ACCEPT ORDER UNLESS YOU CAN OPEN AND HAVE FAMILARITY W

POTENTIAL WRITERS, DO NOT ACCEPT ORDER UNLESS YOU CAN OPEN AND HAVE FAMILARITY WITH .XER SCHEDULE FILES, WRITER WITH CONSTRUCTION (CONTRACTOR)/ PROJECT MANAGEMENT EXPERIENCE PREFERRED!
Hi for this order please review the baseline schedule review pdf specifically review the “Baseline Schedule Review Process” sections for structuring your questions, refer to the table of contents (Review Introduction, Pre-analysis checks, project analysis, activity analysis, etc.).
What I will need is an excel spreadsheet with at least 12 well researched questions (Use Baseline Schedule Review Process on page 3 of 21 as your guidance for drafting your questions) to the four drafted APP 25 Schedule files for the Science, Alaska, Greenland, and the Intermediate schedules (P6 xer and Steelray analysis excel files). These files were submitted by the contractor Battelle for our team to analyze from a schedulers and cost control (labor and hours) standpoint to review for accuracy and thoroughness. The 12 questions you put together in this order will be utilized as follow-up questioning to their team for a compliance check, risk assessment, work breakdown, structure, etc.. resource loading, and labor structure for construction. I will include the .xer files as well to assist you, referencing them will not be necessary if you do not have P6 primavera or an appropriate program to open the files. The attached P6 files XER files in the zip file and the excel steel ray files should be sufficient to complete this order of 12 questions.